Line Metropolitana M4 Milano Project Carpentry

Fifteen kilometers of extension and twenty-one stations that will be added to the 113 of the four lines currently active, for an overall total of about 120 kilometers of tunnels. The new blue line will connect the eastern suburbs with the southwest of the city, up to the terminus of San Cristoforo. when will be finished, bring the Milan metro network among the top ten in Europe, cutting polluting emissions.

The GammaDoors has been charged of the supply in metallic carpentry of finishing of the stations consisting of:

  • Internal elevator shafts glazed closures
  • External elevator covers
  • Escalator covers on the platform exits
  • Emergency stairs covers
  • M" logo holder poles
  • Night-time shutters
icona YEAR: Dal 2022 al 2023
icona LOCATION: Milano (MI)
icona CLIENT:   METRO BLU S.c.a r.l.
immagine 1
immagine 2
immagine 3
immagine 4
immagine 5
immagine 6
immagine 7
immagine 8
immagine 9
immagine 10
immagine 1
immagine 2
immagine 3
immagine 4
immagine 5
immagine 6
immagine 7
immagine 8
immagine 9
immagine 10
Click to enlarge